|

 
Left: ICF Basement walls. Right: Luke beginning prep for second story flooring.
 
Left: ICF Basement Front. Right: Second Story

Second Story

 
Outside Framing almost finished.
 
Second Floor Framing
 

Stairway from 3rd story to 2nd.

3rd story veiw from bedroom
Front Entry, 2nd Floor
 


Roofing, windows and doors have been installed and house wrap has been applied. It's ready for siding! The deck and porch have also been built.
 

The insulation has been installed, and now were ready for drywall.

|